• $
  • €
  • ₽
  • ₺
  • £

Replacement stadium designs unveiled for 2020 Tokyo Olympics

Replacement stadium designs unveiled for 2020 Tokyo Olympics
29.05.2020 10:25
Two new stadium designs have been unveiled for the 2020 Tokyo Olympics after organizers controversially scrapped a previous plan.

A winner will be chosen later this month, the Japan Sports Council said in a statement.

"(The winning design) will be selected by the end of December after further examination by a committee consisting of architectural experts and ministers," said Council president Kazumi Daito.

"We want to create a stadium that can be loved by everyone in the world."

Bike helmet busted
In July, Prime Minister Shinzo Abe announced that the government was ditching Iraqi-British architect Zaha Hadid's "bike helmet" stadium design, which had been projected to cost 150 billion yen ($2.02 billion).

Abe said the scrapping of the design meant the stadium would not be ready in time for the 2019 Rugby World Cup, but said he was "certain" that the project would be ready in time for the 2020 Olympics and Paralympics.

A spokesman for Zaha Hadid Architects blamed increases in construction costs in Tokyo and the difficult of working to a fixed deadline for the stadium's spiralling price tag.

Japanese architects had been scathing of the design, with leading architect Arata Isozaki writing an open letter to the government body in charge of the games that the sight left him "in despair" and warning the stadium would be a "disgrace to future generations."

New designs
The two stadium plans unveiled this week are expected to cost around 154 billion yen (1.26 billion) and will accomodate 80,000 people.

The steel and wood Design A resembles traditional Japanese temples, and stands at a relatively short 50 meters (164 feet) with its main sports field sunken under the ground.

Design B is taller, with more glass. It is intended to reflect traditional Asian concepts of the five elements: fire, earth, metal, wood and water, according to a statement.

The Sports Council didn't reveal who the architects were.

Whichever plan is eventually chosen, construction is due to be completed by November 30, 2019, 266 days before the Olympics Opening Ceremony.

(CNN)
 




www.ann.az
Twitter
Go
Similar news
Similar news
Lionel Messi retires from international football
Sport 11:00
Lionel Messi retires from international football
UEFA Nations League Matchday 4: Azerbaijan secures win over Lithuania
Sport 16:00
UEFA Nations League Matchday 4: Azerbaijan secures win over Lithuania
FIFA President Gianni Infantino arrives in Tashkent ahead of U-20 World Cup 2027
Sport 14:30
FIFA President Gianni Infantino arrives in Tashkent ahead of U-20 World Cup 2027
Dates announced for postponed Qarabag and Sabah matches
Sport 16:30
Dates announced for postponed Qarabag and Sabah matches
Nakhchivan athlete arrested on fraud charges
Sport 17:00
Nakhchivan athlete arrested on fraud charges
Azerbaijani chess player Hikmat Ismayilov crowned French champion
Sport 17:30
Azerbaijani chess player Hikmat Ismayilov crowned French champion
Five Baku schools shift to remote learning for Azerbaijan Grand Prix
Sport 16:30
Five Baku schools shift to remote learning for Azerbaijan Grand Prix
Formula 1 to shorten Grand Prix race distance from 2027
Sport 09:30
Formula 1 to shorten Grand Prix race distance from 2027
Draw held for 2026/27 Azerbaijan Cup season
Sport 15:33
Draw held for 2026/27 Azerbaijan Cup season
Anews TV

Our official Youtube channel

Subscribe